Arrival: AOR taken over, map unverified
GFD IT handed over the AOR map and admin contacts. Turbines have not stopped in eleven years. No ROE yet, so exploration stays passive until Annex B arrives.
Top 5 assets · asset sheet
| # | Asset | Zone | Class | Admin (handover list) | Main threat (OpOrd) | Who may act (Annex D) | First check (passive) |
|---|---|---|---|---|---|---|---|
| 1 | Turbine SCADA | Turbine room · ICS | critical | L. Meier · control room ext 300 · shifts | Sabotage after lateral movement from IT. Degradation = PIR. | GFD IT only | Who talks to SCADA? Flows at the central switch (span/tap). |
| 2 | Control Client | Turbine room · ICS | critical | L. Meier · control room ext 300 · shifts | Pivot to SCADA via domain or compromised tools. | GFD IT only | Domain-joined? Which accounts log on? Internet access? (RFI 1) |
| 3 | Domain Controller | Core | critical | R. Baumann · ext 214 · on call nights | Lateral movement, credential theft (APT99, CACYBERCOM). | GFD IT only | Read-only: admin group members, new accounts / GPOs, logon events. |
| 4 | Splunk | Core | non-critical | R. Baumann · ext 214 · on call nights | Compromised security tool: blinds us or feeds a false picture. | Shutdown: TL · Isolate: TL, Mission Spec · Harden: all | Admin accounts, forwarder list, recent config changes. Cross-check with own capture. |
| 5 | Web Server | Outside networks | non-critical | not on list · gap | Web exploits (CACYBERCOM), DDoS (CCIA). | Shutdown: TL · Isolate: TL, Mission Spec · Harden: all | Exposed services and versions, web logs for exploit attempts, any path into the internal net. |
AOR network map · criticality
critical
non-critical (CPAL)
watch
not ranked
ICS outside AOR
CPAL · initial (provisional)
| # | Asset | Class | Reasoning |
|---|---|---|---|
| 1 | Turbine SCADA | critical | Directly controls energy production. |
| 2 | Control Client | critical | Operators' only interface to the turbines. Confirm via RFI 1. |
| 3 | Domain Controller | critical | Core operations: authentication for all domain systems; possible dependency of the Control Client. |
| 4 | Splunk | non-critical | Production runs without it. Our visibility, but untrusted until verified (OpOrd: security tools likely compromised). |
| 5 | Web Server | non-critical | Production runs without it. Most likely entry point (DDoS, web exploits). |
| · | Central switch | watch | Control Client ↔ SCADA traffic passes it on the map. Likely critical. |
| · | Release Hut / Starlink | outside AOR | Internet-exposed Water Release SCADA. Escalated, not ours to touch. |
Explore first: passive traffic mapping at the central switch (span/tap, no active scans in the turbine room). It shows what really talks to SCADA and the Control Client, verifies the map, and cannot stop a turbine while the ROE is missing.
RFIs · requests and escalations
| ID | To · channel | Question | Status |
|---|---|---|---|
| RFI 1 | Control room ext 300 (L. Meier / shift sup., 24/7) PRIORITY · TONIGHT | Can the turbines keep producing without the Control Client, the DC or the central switch? Does Control Client / SCADA depend on AD auth? | open |
| RFI 2 | S. Rochat, network ext 216 (from 08:00) | Which connections are missing from the map: remote/vendor access to SCADA, VPN, Wi-Fi bridges, any path Release Hut ↔ Base Station? | open · expect 08:00 |
| ESC 1 | Cy Bat 42 · Matrix | Annex B (ROE) not received. No active measures until it arrives. | open |
| ESC 2 | Cy Bat 42 · Matrix + report 2100 | Release Hut: internet-exposed ICS outside AOR. Request clarification of responsibility / AOR extension. | open |
Journal
| Game time | Entry |
|---|---|
| 24.07 2000 | AOR, map and admin contacts taken over from GFD IT. Phase 1 started. |
| 24.07 2000 | Annex B missing: exploration passive only. Escalated to Cy Bat 42 (ESC 1). |
| 24.07 2000 | Initial CPAL set (provisional). Splunk treated as untrusted. |
| 24.07 2000 | RFI 1 → control room (tonight), RFI 2 → network admin (08:00). |
| 24.07 2000 | Release Hut / Starlink flagged as risk outside AOR (ESC 2). |
| 24.07 2000 | Gap: no admin listed for Web / Mail server. Raise at 2100 report. |
Competence matrix · Annex D
| Action | GFD IT | MDT TL | Mission Spec | Tech Spec |
|---|---|---|---|---|
| NON-CRITICAL SYSTEM | ||||
| Shutdown | ✔ | ✔ | ✘ | ✘ |
| Isolation | ✔ | ✔ | ✔ | ✘ |
| Hardening | ✔ | ✔ | ✔ | ✔ |
| CRITICAL SYSTEM | ||||
| Shutdown / Isolation / Hardening | ✔ | ✘ | ✘ | ✘ |
✔ competency to decide · ✘ permission from higher level required
CCIR · report immediately
- PIR: critical service unavailable · ICS degraded · enemy presence found
- FFIR: team overwhelmed / unable to complete · team underwhelmed
- EEFI: cyber key terrain · critical applications and services · NSL additions
Battle rhythm
- 0900 / 2100 Cyber Status Report (SAFCYOC, GFD IT, Cy Bat 42), document at start
- 1400 Task Force situational meeting · 1600 logistics
- 25.07 1200 end of Phase 1 · end-of-phase report
PACE: Matrix · Teams · Rocket Chat · runner